BWzKH Hospital: System, IT & Electrical Technology
Challenge
Low-current and high-current components, distributors, IT technology, system technology, specialization to meet the requirements
Solution
A well-coordinated project team with very short service paths provides the following services:
New installation of the entire electrical installation in the new surgical and functional building
Video surveillance
2800 KNX devices
4 low-voltage main distribution boards (87 panels)
BSV systems
UPS systems
Server cabinets
House alarm
Patient/nurse call system
Intercom system incl. video technology
Helipad
Lighting systems and lights
Network and IT technology
Network connections (approx. 21,000)
Splicing work
Data cables (approx. 270 km)
IT tablets
Landesbetrieb Liegenschafts- und Baubetreuung Rheinland-Pfalz, Koblenz branch (LBB NL Koblenz)