Mannheim

VAREAL

Challenge

The project involves a large-scale commercial complex consisting of both existing and new buildings. The main challenge was to develop an optimal, holistic heating concept that takes into account the varying requirements of the individual buildings and effectively combines different supply solutions.

Solution

A modern heat pump concept was developed that combines air-to-water and water-to-water heat pumps. The individual buildings in the industrial park are connected to one another via a shared loop system and integrated into the supply concept.

Location

Steinzeugstraße 14-48a
68229 Mannheim
Client

AVENTOS Managmenet GmbH

Type of building

Gewerbeareal

Realisation
03

Key Facts

  • Installed thermal capacity of heat pumps: 1,260.0 kWt
  • Heat output (heat pump output): 1,993.0 MWh/year
  • Cooling capacity (heat pump output): 597.9 MWh/year
  • Installation of a heat pump system in a total of 16 energy centers